HomeMaterialsBlogAboutContactFAQ

Finolex UPVC (Schedule 40 (Standard))

⚡ Kolkata · Direct Mill Supply · Direct Mill Baseline
Procurement Benchmarks & Direct Mill Terms
✓
Live Benchmark Rate: ₹145 / 3M LENGTH (1") · Delivered to Kolkata Sites.
✓
Batch MTC Guaranteed: Verified Mill Test Certificate from Finolex UPVC dispatched with every load, confirming strength tests.
✓
Factory Tamper-Proof Packaging: Sealed poly-lined valve bags preventing moisture intrusion and premature clinker hydration.
✓
Strict Guarantee: Strict adherence to Bureau of Indian Standards (IS 4985 (SCH 40/80))
✓
Direct Guarantee: Direct mill consignment preventing stockyard handling damage
✓
Immediate Guarantee: Immediate batch tracking with manufacturer test certificate
🚚Assured Direct DispatchSite delivery in 24–48 hrs
⏱️Fresh Clinker Guarantee< 15 days batch age
🛡️BIS Certified QualityIS 4985 (SCH 40/80)

Technical Specifications & Bureau Compliance

Manufacturer / BrandFinolex UPVC
Product CategoryUPVC Pressure Pipes
Standard ComplianceIS 4985 (SCH 40/80) CERTIFIED
Compressive Strength @ 28 DaysMeets Bureau Mandate
Compressive Strength @ 3 DaysBatch MTC Guaranteed
Initial Setting Time165 mins (BIS Requirement: Min 30 mins)
Final Setting Time245 mins (BIS Requirement: Max 600 mins)
Fineness (Blaine Air Permeability)285 m²/kg (BIS Mandate: Min 225 m²/kg)
Packaging Format50 KG Net Multi-Ply Poly-Lined Valve Bag
Regional Supply HubKolkata · Direct Mill Supply
Shipped by Ostaad Verified LogisticsSold by Finolex UPVC Primary Mill Network
BASE BENCHMARK RATE (FROM)
From₹125
/ 3M LENGTH (1")
Active: Schedule 40 (Standard) (₹125)
Calculate Quota ↓

How does Ostaad Bulk Buying work?

1
Calculate volume below: Enter your structural slab, pillar, or plaster area into the calculator.
2
Receive mill-direct quote: Transparent rate with zero regional dealer hoarding margins.
3
Site dispatch with MTC: Fresh bags unloaded directly at your site with verified batch lab reports.
● 100% GENUINE FINOLEX UPVC · NO ADULTERATION
ALL AVAILABLE SPECIFICATIONS

Finolex UPVC Variants & Thickness Rates

Base variant starts from ₹125 / 3M LENGTH (1"). Click any variant below to inspect full specifications, load capacity, and calculate exact quotas.

3 Verified Specifications
SCHEDULEACTIVE

Schedule 40 (Standard)

Schedule 40 (Standard) manufactured by Finolex UPVC conforming to IS 4985 (SCH 40/80).

Rate:
₹125
SCHEDULE

Schedule 80 (Heavy)

Schedule 80 (Heavy) manufactured by Finolex UPVC conforming to IS 4985 (SCH 40/80).

Rate:
₹145
THREADED

Threaded Tank Connectors

Threaded Tank Connectors manufactured by Finolex UPVC conforming to IS 4985 (SCH 40/80).

Rate:
₹145
ESTIMATION & MIX DESIGN

Finolex UPVC Bag & Material Estimator

Input the structural casting area to compute the exact ratio of Finolex UPVC bags, Coarse River Sand, and Crushed Aggregate needed for casting.

CALCULATED MATERIAL QUOTA (Finolex UPVC)
133 Bags Required

Calculated for 1,000 sq ft with 5% casting margin.

ESTIMATED CEMENT COST
₹16,625
COARSE SAND REQD
187 cft
CRUSHED AGGREGATE
374 cft
HYDRAULIC CURING KINETICS

Finolex UPVC Compressive Strength Development

Simulate hydraulic compressive strength development across the standard 28-day water curing cycle under IS 4031 testing guidelines.

OPC Grade 53 (IS 12269) · High Early Strength← You are buying this
OPC Grade 43 (IS 8112) · General Structural
PPC Pozzolana (IS 1489) · Dense Matrix & Durability
60 MPa45 MPa30 MPa15 MPa0 MPa27.0 MPa37.0 MPa46.0 MPa54.8 MPa23.0 MPa33.0 MPa39.0 MPa44.8 MPa16.5 MPa23.0 MPa31.0 MPa38.5 MPaDAY 3DAY 7DAY 14DAY 28 (FINAL)Initial De-shutter65% Standard Cure85% Structural Load100% 28-Day Target
TECHNICAL COMPLIANCE AUDIT

Bureau of Indian Standards (BIS) Benchmark Matrix

PHYSICAL & CHEMICAL AUDIT CRITERIA AS PER IS 4031 & IS 4032

PROPERTYIS 12269 (GRADE 53)IS 8112 (GRADE 43)IS 1489 (PPC)
3-Day Compressive Strength≥ 27.0 MPa≥ 23.0 MPa≥ 16.0 MPa
7-Day Compressive Strength≥ 37.0 MPa≥ 33.0 MPa≥ 22.0 MPa
28-Day Compressive Strength≥ 53.0 MPa≥ 43.0 MPa≥ 33.0 MPa
Initial Setting Time≥ 30 mins≥ 30 mins≥ 30 mins
Final Setting Time≤ 600 mins≤ 600 mins≤ 600 mins